Analisis Alternatif Percepatan Projek Reparasi ORCA LAUT 7296 Mengguankan Metode Korelasi SPSS
DOI:
https://doi.org/10.55606/jupiman.v2i2.1567Keywords:
Alternative Acceleration, Repair, Correlation, SPSS.Abstract
Repair activities are one of the ship maintenance schedules. In the ORCA LAUT 7296 ship repair project, acceleration of project activities is carried out to save repair time. This is done so that the ship can operate immediately and the shipyard can receive a new ship project that you want to repair or build a new ship. ORCA LAUT 7296 has several jobs, especially on hull replating activities due to the ship having run aground and experiencing a leak. In this study, an analysis of project acceleration was carried out using the correlation method with the help of the SPSS application. Analysis is carried out to obtain the best alternative to accelerate the project. The results of this study can be carried out as much as 30% of project acceleration through the addition of 3 hours of overtime hours so that, from the beginning the target was completed in 34 days after acceleration, it became 25 days.
Downloads
References
Abdurrasyid, A., Luqman, L., Haris, A., & Indrianto, I. (2019). Implementasi Metode Pert Dan Cpm Pada Sistem Informasi Manajemen Proyek Pembangunan Kapal. Khazanah Informatika : Jurnal Ilmu Komputer Dan Informatika, 5(1), 28–36. Https://Doi.Org/10.23917/Khif.V5i1.7066
Askar, A., & Sani, A. (2022). Hubungan Implementasi Program K3 Terhadap Produktivitas Kerja Pada Pekerja Di Pt. Industri Kapal Indonesia. 3(2). Https://Doi.Org/10.33096/Woph.V3i2.435
Candra Kartika Putri & Sujoko. (2022). Analisis Store Atmosphere Dan Kualitas Pelayanan Berdasarkan Persepsi Pelanggan. Jurnal Ekonomi, Bisnis Dan Manajemen, 1(4), 269–280. Https://Doi.Org/10.58192/Ebismen.V1i4.164
Hidayat, T., & Darmana, E. (2022). Analisis Terhambatnya Proses Docking Kapal Dan Terhambatnya Proses Bongkar Muat Yang Disebabkan Kerusakan Pada Floating Dock Crane Di Galangan Pt. Pal Indonesia (Persero). Majalah Ilmiah Gema Maritim, 24(1), 8–17. Https://Doi.Org/10.37612/Gema-Maritim.V24i1.272
Irfan, S., & Rusiyanto, R. (2021). Perancangan Cnc Plasma Cutting Menggunakan Software Autodesk Inventor 2015. Jurnal Rekayasa Mesin, 12(1), 1. Https://Doi.Org/10.21776/Ub.Jrm.2021.012.01.1
Irwan, H., & Purbasari, A. (2015). Analisa Studi Kelayakan Penambahan Mesin Cnc Baru Dengan Metode Npv(Net Present Value) Di Pt.Usda Seroja Jaya Shipyard Batam. Https://Doi.Org/10.33373/Profis.V3i2.336
Khristyson, S. F., Sulaiman, S., & Prahasti, R. (2020). Analisa Investment Casting Perannya Untuk Reparasi Towing Beam Kapal Tunda Dengan Metode Elemen Hingga. Jurnal Rekayasa Mesin, 15(2), 154. Https://Doi.Org/10.32497/Jrm.V15i2.1764
Mey Krisselni Sitompul, Tri Mardalena, & Yusriadi. (2022). Analisis Manajemen Proses Pembuatan Tongkang Di Pt. Karimun Marine Shipyard. Jurnal Jalasena, 3(2), 95–110. Https://Doi.Org/10.51742/Jalasena.V3i2.547
Muhammad Iqbal Sayuti Harahap, Raudhatun Sumi, & Budi Dharma. (2022). Analisis Bentuk Dari Penyusunan Laporan Keuangan Masjid (Studi Kasus Pada Masjid Raya Sulaimaniyah Kesultanan Serdang, Kota Perbaungan). Jurnal Ekonomi, Bisnis Dan Manajemen, 1(4), 217–229. Https://Doi.Org/10.58192/Ebismen.V1i4.159
Oktafiana, L. O., & Baroroh, I. (2022). Comparative Analysis Of Cpm, Pdm And Pert Methods In Ship Repair Scheduling Planning Kn. Rb 309 Ternate 01. Berkala Sainstek, 10(3), 162. Https://Doi.Org/10.19184/Bst.V10i3.32479
Pradini, A. H., Lucitasari, D. R., & Putro, G. M. (2019). Perbaikan Sistem Kerja Dengan Pendekatan Macroergonomic Analysis And Design (Mead) Untuk Meningkatkan Produktifitas Pekerja (Studi Kasus Di Ud Majid Jaya, Sarang, Rembang, Jawa Tengah). Opsi, 12(1), 36. Https://Doi.Org/10.31315/Opsi.V12i1.2897
Purwangka, F., Deornay, I. V., & Wahyuningrum, P. I. (2022). Safety Work On Ship’s Docking Area Of Pt Perikanan Indonesia Muara Baru. Https://Doi.Org/10.29244/Jmf.V13i2.40422
Rahmat, R. F., Wahidin, A., & Radianto, D. O. (2022). Optimalisasi Biaya Replating Dalam Proses Reparasi Starboard Side Padakmp. Dharma Kartika Viii. 4. Https://Doi.Org/10.51742/Ojsm.V4i1.639
Subawa, I. N., Sitanggang, E. P., & Polii, J. F. (2016). Studi Tentang Kerusakan Dan Lama Perbaikan Kapal Ikan Yang Melakukan Perbaikan Di Bengkel Latih Kapal Perikanan Politeknik Kelautan Dan Perikanan Bitung. Jurnal Ilmu Dan Teknologi Perikanan Tangkap, 2(2). Https://Doi.Org/10.35800/Jitpt.2.2.2015.10406
Tabita, A., Adiputra, N., & Sutarja, I. N. (2017). Pengaturan Organisasi Kerja Housekeeping Dengan Pendekatan Ergonomi Dapat Menurunkan Keluhan Muskuloskeletal, Kelelahan, Dan Mempercepat Waktu Kerja. Jurnal Ergonomi Indonesia (The Indonesian Journal Of Ergonomic), 3(1), 39. Https://Doi.Org/10.24843/Jei.2017.V03.I01.P05
Timur Raja, A. A., & Basuki, M. (2022). Pengembangan Sistem Aplikasi Manajemen Reparasi Kapal Berbasis Web Dengan Aspek Lokasi Dan Kapasitas Galangan Kapal. Jurnal Sumberdaya Bumi Berkelanjutan (Semitan), 1(1), 415–422. Https://Doi.Org/10.31284/J.Semitan.2022.3244
Zein, S., Yasyifa, L., Ghozi, R., Harahap, E., Badruzzaman, F., & Darmawan, D. (2019). Pengolahan Dan Analisis Data Kuantitatif Menggunakan Aplikasi Spss. 4. Https://Doi.Org/10.31980/Tp.V4i1.529