Penerapan Konsep Lean Manufacturing Untuk Redesign Tata Letak Fasilitas Dengan Pendekatan Value Stream Mapping Pada UMKM Roti Agifa

Authors

  • Ridwan Adi Setiabudi Universitas Teknologi Yogyakarta
  • Nabila Kurnia Ramadhani Universitas Teknologi Yogyakarta
  • Eko Apriyana Universitas Teknologi Yogyakarta
  • Fadila Woro Wulandari Universitas Teknologi Yogyakarta
  • Dista Amelia Universitas Teknologi Yogyakarta

DOI:

https://doi.org/10.55606/jtmei.v4i1.4789

Keywords:

Lean Manufacturing, Value Stream Mapping, waste, facility layout

Abstract

Agifa Roti is one of the small and medium enterprises (SMEs) engaged in the food industry, located in Warungboto, Umbulharjo District, Yogyakarta City, Special Region of Yogyakarta. The products produced are in the form of basic ingredients for sweet bread, in the production process it is still traditional without using the help of machines only during the baking process using a gas-fueled oven and mixer to make dough. facing waste constraints in the sweet bread production process, especially in waiting activities (31.07%) and transportation (8.90%). This waste is caused by the less than optimal layout of facilities, with a distance of movement between work stations reaching 810.99 cm. This study aims to identify waste, reduce waste, and increase production efficiency through the application of the Lean Manufacturing method with the Value Stream Mapping (VSM) approach including the calculation of Material Handling Costs (OMH) to assess cost efficiency. Research methods related to cycle time, lead time, changeover time, and facility layout. Based on the research results, it shows that the application of the Lean Manufacturing method with the VSM approach is able to reduce the distance of movement between work stations by 29.2%, production cycle time by 61.2%, and material handling costs significantly, thereby increasing efficiency, reducing waste, and providing real benefits for the productivity and competitiveness of Roti Agifa MSMEs and similar MSMEs.

Downloads

Download data is not yet available.

References

Adib, J., Momon Subagyo, A., & Sari, R. P. (2023). Perancangan Ulang Tata Letak Pabrik Industri Olahan Rotan PT XYZ di Kabupaten Cirebon Menggunakan Metode Systematic Layout Planning. VIII(3).

Anik, M., & WIbowo, A. (t.t.). Mengurangi Ongkos Material Handling Melalui Perbaikan Layout Menggunakan System Layout Planning (SLP).

Awanis, A., & Vikaliana, R. (2023). Implementation of Lean Manufacturing to Identify and Minimize Waste in The Welding Framebody Department of PT XYZ. Journal of Emerging Supply Chain, Clean Energy, and Process Engineering, 2(1), 1–15. https://doi.org/10.57102/jescee.v2i1.23

Bani Syaher, A., Teknologi Yogyakarta Muhammad Mukti, U., Teknologi Yogyakarta Irfan Ramadhan, U., Teknologi Yogyakarta Ari Zaqi Alfaritsy, U., Teknologi Yogyakarta Alamat, U., Glagahsari No, J., Umbulharjo, K., Yogyakarta, K., & Istimewa Yogyakarta, D. (2024). PENDEKATAN LEAN MANUFACTURING MENGGUNAKAN METODE VALUE STREAM MAPPING (VSM) PADA UMKM SAMIKEM SABLON. Jurnal Ilmiah Penelitian Mahasiswa, 2(4), 423–432. https://doi.org/10.61722/jipm.v2i4.303

Elizabeth, E., Nasution, S., & Montreano, D. (2024). Reduksi Waste dengan Penerapan Lean Manufacturing pada Proses Produksi Glassfibre Reinforced Concrete (GRC) Krawangan di Pabrik XYZ. Journal of Optimization System and Ergonomy Implementation, 1(02). https://doi.org/10.54378/joseon.v1i02.7501

Id, //Ojs Stiami Ac, & Abdul, F. W. (2018). LEAN MANUFACTURING IMPLEMENTATION IN INVENTORY CONTROL AS A REPAIR PROCESS. 2(1), 31–36. http://ojs.stiami.ac.id

Krisnanti, E. D., & Garside, A. K. (2022). Penerapan Lean Manufacturing untuk Meminimasi Waste Percetakan Box. Jurnal INTECH Teknik Industri Universitas Serang Raya, 8(2), 99–108. https://doi.org/10.30656/intech.v8i2.4780

Kurnia, J., & Widyadana, I. G. A. (2022a). IDENTIFIKASI DAN ELIMINASI PEMBOROSAN DENGAN MENGGUNAKAN KOMBINASI METODE VALUE STREAM MAPPING (VSM) DAN COST TIME PROFILE (CTP): STUDI KASUS DI PT SABE INDONESIA. Dimensi Utama Teknik Sipil, 9(2), 168–183. https://doi.org/10.9744/duts.9.2.168-183

Kurnia, J., & Widyadana, I. G. A. (2022b). IDENTIFIKASI DAN ELIMINASI PEMBOROSAN DENGAN MENGGUNAKAN KOMBINASI METODE VALUE STREAM MAPPING (VSM) DAN COST TIME PROFILE (CTP): STUDI KASUS DI PT SABE INDONESIA. Dimensi Utama Teknik Sipil, 9(2), 168–183. https://doi.org/10.9744/duts.9.2.168-183

Mu’min, M. A., & Nurbani, S. N. (t.t.). Analisis Lean Manufacturing Menggunakan WAM dan VALSAT untuk Mengurangi Waste Proses Produksi Teh dalam Kemasan 300 ml di PT. Dalam XYZ Jurnal ReTiMs (Vol. 4, Nomor 1).

Nur Rasyid, A., Aris Hendaryanto, I., Setiawan, W., & Winarno, A. (2024). Analisis Re-layout Line Machining Oil Separator dengan Metode Value Stream Mapping dalam Meningkatkan Efisiensi Produktivitas di PT. Astra Otoparts Divisi Nusametal 1) (Vol. 8, Nomor 2).

Pattiapon, M. L., Maitimu, N. E., & Magdalena, I. (2020). PENERAPAN LEAN MANUFACTURING GUNA MEMINIMASI WASTE PADA LANTAI PRODUKSI (Studi Kasus: UD. FILKIN). ARIKA, 14(1).

Perjuangan Karawang Jalan Ronggo Waluyo Sirnabaya, B., Karawang, K., & Barat, J. (t.t.). ANALISA EFEKTIVITAS PROSES SINTER PLANT DENGAN PENDEKATAN LEAN MANUFACTURING. Dalam Jurnal InTent (Vol. 3, Nomor 2).

Rengganis, E., Mauidzoh, U., Teknik Industri, J., Tinggi, S., Adisutjipto, T., Janti Blok, J., Adisutjipto, L., Jambe, K., & Bantul, B. (2021). Re-Layout Penempatan Fasilitas Produksi dengan menggunakan Metode Systematic Layout Planning dan Metode 5 S Guna Meminimalkan Biaya Material Handling. Jurnal Rekayasa Industri (JRI), 3(1).

Restuasih, S., Harjiyanto, K., & Juhri. (2024). EVALUASI EFISIENSI WASTE KOMPONEN RANGKA 450 CRS DENGAN METODE VALUE STREAM MAPPING DI PT PLTP. TECHNO-SOCIO EKONOMIKA, 17(1), 1–15. https://doi.org/10.32897/techno.2024.17.1.2857

Rido, A., Dahda, S. S., & Ismiyah, E. (2020). PENDEKATAN LEAN MANUFACTURING SEBAGAI USULAN UNTUK MEMINIMALKAN WASTE PADA PROSES PRODUKSI KAYU DECKING (Studi Kasus : Perusahaan Pengolahan Kayu di Lamongan). 1(4), 530.

Santoso, C. A., & Noya, S. (2020). Perancangan Ulang Tata Letak Fasilitas di PT Goldfindo Intikayu Pratama Menggunakan Analisis Lean Manufacturing. Dalam Jurnal Ilmiah SAINSBERTEK (Vol. 1).

Santoso, C. A., Alexander, S., & Noya, T. (2020). PERANCANGA ULANG TATA LETAK FASILITAS DI PT GOLDFINDO INTIKAYU PRATAMA MENGGUNAKAN ANALISIS LEAN MANUFACTURING. Dalam Jurnal Ilmiah SAINSBERTEK (Vol. 1).

Sirojudin, T., Syah, T., Aima, H., & Ketut, S. (t.t.). Implementasi Lean Manufacturing pada PT Luxury Indah Jaya Menggunakan Metode Value Stream Mapping. 12(5).

Wirawan, S. T., & Suryati, A. (t.t.). Penerapan Konsep Lean Manufacturing untuk Mendesain Ulang Tata Letak Fasilitas di Industri Mikro Kecil Menengah. Bussman Journal: Indonesian Journal of Business and Management, 3(2), 2023. https://doi.org/10.53363/buss.v3i2.151

Downloads

Published

2025-01-24

How to Cite

Ridwan Adi Setiabudi, Nabila Kurnia Ramadhani, Eko Apriyana, Fadila Woro Wulandari, & Dista Amelia. (2025). Penerapan Konsep Lean Manufacturing Untuk Redesign Tata Letak Fasilitas Dengan Pendekatan Value Stream Mapping Pada UMKM Roti Agifa. Jurnal Teknik Mesin, Industri, Elektro Dan Informatika, 4(1), 135–151. https://doi.org/10.55606/jtmei.v4i1.4789