Analisis Perawatan Heading Machine dengan Metode Reliability Centered Maintenance (RCM)

Authors

  • Danang Risky Suhadi Politeknik Negeri Malang
  • Kris Witono Politeknik Negeri Malang

DOI:

https://doi.org/10.55606/jtmei.v3i3.4183

Keywords:

Weibull Distribution, FMEA, Heading Machine, Maintenance Schedule, Reliability Centered Maintenance

Abstract

The heading machine is a critical type of machine used in the production of header tubes. If a failure occurs during the production of header tubes, the product cannot proceed to the next process and must be discarded. However, this machine frequently encounters component failures that require halting the machine for repairs, which is detrimental to the company. This research aims to enhance the machine's reliability by identifying the critical components and scheduling appropriate maintenance based on the heading machine's needs. The research method used is RCM, which includes collecting data on machine downtime and repairs, creating an FMEA table, identifying critical components, calculating TTF and TTR, determining component distribution patterns, establishing parameters, calculating the reliability of critical components, and scheduling maintenance. The research findings identified the critical components as conical spring for orifice and jaw for thread. The calculation of the reliability value using the Weibull distribution equation with scale and shape parameters for the conical spring for orifice components are 1001.78 and 1.12285, respectively. For the jaw for thread component, the scale and shape parameters are 532.083 and 1.33233, respectively, based on values derived from statistical software. As a result, the maintenance schedule should be set when the reliability value of the conical spring for orifice and jaw for thread reaches 0.5 at (t) 720 hours or 30 days, and (t) 390 hours or 17 days, respectively.

Downloads

Download data is not yet available.

References

Agustiani, & Sulistyani, A. (2022, Desember 11). Mekanisme perawatan kitchen equipment pada kitchen section di Fox Hotel Pekanbaru. Jurnal Online Mahasiswa, 9(2), 1-10. https://jom.unri.ac.id/index.php/JOMFSIP/article/viewFile/33713/32406

Alsakina, A., & Momon, A. (2023, Agustus). Analisis perawatan mesin injection dengan metode RCM pada perusahaan manufaktur. Satuan Riset dan Inovasi Teknologi, 8(1), 20-27. http://dx.doi.org/10.30998/string.v8i1.16089

Anggraini, W., Fachri, M., Yola, M., & Harpito. (2020). Reliability centered maintenance pada komponen kritis mesin press. Jurnal Teknik Industri, 6(2), 86-92. http://dx.doi.org/10.24014/jti.v6i2.9701

Darmawan, A., Rapi, A., & Ali, S. (2016, Juni). Analisis perawatan untuk mendeteksi risiko kegagalan komponen pada excavator 390D. Jurnal Ilmiah Teknik Industri, 15(1), 109-115. https://doi.org/10.23917/jiti.v15i2.2139

Ebeling, C. E. (1997). An introduction to reliability and maintainability engineering. Waveland Press, Incorporated.

Nasution, R. H., Hasibuan, Y. M., Harahap, U. N., Ningrum, S. A. O., & Chaniago, A. F. (2020, Oktober 30). Analisis perencanaan perawatan mesin sterilizer dengan metode overall equipment effectiveness dan six big losses di PT Torganda PKS Rantau Kasai. Jurnal Simetri Rekayasa, 2(2), 129-136.

Pasaribu, N., & Alhazami, L. (2022, Oktober). Pengaruh kualitas bahan baku dan pemeliharaan mesin terhadap kualitas produk pada PT. Toba Pulp Lestari, TBK. Jurnal Riset Rumpun Ilmu Ekonomi (JURRIE), 1(2), 90-93. https://doi.org/10.55606/jurrie.v1i2.365

Siregar, H. H., & Munthe, S. (2019, November). Analisa perawatan mesin digester dengan metode reliability centered maintenance pada PTPN II Pagar Merbau. JIME (Journal of Industrial and Manufacture Engineering), 3(2), 88-94. http://repository.uma.ac.id/handle/123456789/10678

Published

2024-08-08

How to Cite

Danang Risky Suhadi, & Kris Witono. (2024). Analisis Perawatan Heading Machine dengan Metode Reliability Centered Maintenance (RCM). Jurnal Teknik Mesin, Industri, Elektro Dan Informatika, 3(3), 149–163. https://doi.org/10.55606/jtmei.v3i3.4183