Optimasi Penjadwalan Mesin Bor Manual pada Produksi Side Chair Menggunakan Metode Shortest Processing Time (SPT)

Authors

  • Indah Rizqiana Universitas Islam Nahdlatul Ulama Jepara
  • Muhammad Choiru Zulfa Universitas Islam Nahdlatul Ulama Jepara

DOI:

https://doi.org/10.55606/jtmei.v3i3.4160

Keywords:

Manual Drilling, Shortest Processing Time (SPT), Optimization, Scheduling

Abstract

CV Mandiri Abadi is a manufacturing industry that operates on a make-to-order system, specifically for side chair products, necessitating a carefully considered scheduling system. Issues with the use of manual drilling machines causing delays in component deliveries to the warehouse prompted an evaluation of optimal production scheduling using the shortest processing time (SPT) method. This study includes detailed calculations to determine average completion time, utilization, average job time, and average job delay. Analysis results show that using manual drilling machines achieved an average completion time of 854.28 minutes, a proposed utilization improvement of 28%, an average job time of 3.46 minutes, and an average delay of 614.14 minutes. This approach is more effective in optimizing processing time and reducing delivery delays. Therefore, the use of the shortest processing time (SPT) method is recommended to improve production performance within the company.

 

Downloads

Download data is not yet available.

References

N. Nurfadillah, A. N. Hikmah, Y. Wahyuni, N. Nurhaliza, S. P. Fatimah, And N. Nasbar, “Model Optimasi Dalam Penjadwalan Produksi Kerajinan Pelepah Pisang (Studi Kasus : Kub Anggrek Desa Aska),” Jurnal Riset Multidisiplin, Vol. 2, No. 1, Pp. 31–37, May 2024, Doi: 10.61316/Jrma.V2i1.41.

W. Isnaini, “Optimasi Penjadwalan Produksi Di Ikm Ed Aluminium Yogyakarta,” Kaizen : Management Systems & Industrial Engineering Journal, Vol. 1, No. 1, P. 15, Jun. 2018, Doi: 10.25273/Kaizen.V1i1.2569.

G. Maulana Mulyadi, E. Aristriyana, And Y. Kurnia, “Penjadwalan Produksi Pada Perusahaan Wajan Cap Buaya Menggunakan Metode Shortest Processing Time (Spt) Di Desa Pusakasari Kecamatan Cipaku Kabupaten Ciamis,” Intriga (Info Teknik Industri Galuh), Jurnal Mahasiswa Teknik Industri, Vol. 1, No. 1, Pp. 45–50, Oct. 2023, Doi: 10.25157/Intriga.V1i1.3600.

Nanang Nazarudin And Tegar Putramas, “Analisis Penjadwalan Produksi Menggunakan Metode Shortest Proccesing Time Untuk Meningkatkan Produktivitas Kerja Pada Ukm Sartika Dms Kujangsari Di Kota Banjar,” Vol. 4, No. 1, P. 2022.

K. R. Baker, Introduction To Sequencing And Scheduling. New York: Jhon Wiley And Sons, 1974.

J. E. Biegel, Pengendalian Produksi Suatu Pendekatan Kuantitatif. Jakarta: Akademika Presindo, 1999.

R. W. Conway, W. L. Maxwell, And L. W. Miller, Theory Of Scheduling. Boston: Addison-Wesley Co., 1967.

M. R. Fadli And W. Sulistiyowati, “Optimization Of Pipe Production Scheduling In Line 18 Using First Come First Serve (Fcfs), Earlier Due Date (Edd), Short Process Time (Spt) Methods (Case Study: Pt Wtur),” Prozima (Productivity, Optimization And Manufacturing System Engineering), Vol. 3, No. 2, Pp. 44–54, Mar. 2021, Doi: 10.21070/Prozima.V3i2.1268.

J. Heizer And Barry Render, Manajemen Operasi, Ketujuh., Vol. 1. Jakarta: Salemba Empat, 2010.

R. I. Safitri, “Analisis Sistem Penjadwalan Produksi Berdasarkan Pesanan Pelanggan Dengan Metode Fcfs, Lpt, Spt Dan Edd Pada Pd. X,” Jurnal Optimasi Teknik Industri, Vol. 1, No. 2, Pp. 26–30, 2019.

Heizer, Jay, And Barry Rander, Manajemen Operasi, Manajemen Keberlangsungan Dan Rantai Pasokan, 11th Ed. Jakarta: Salemba Empat, 2014.

Published

2024-08-06

How to Cite

Indah Rizqiana, & Muhammad Choiru Zulfa. (2024). Optimasi Penjadwalan Mesin Bor Manual pada Produksi Side Chair Menggunakan Metode Shortest Processing Time (SPT) . Jurnal Teknik Mesin, Industri, Elektro Dan Informatika, 3(3), 97–108. https://doi.org/10.55606/jtmei.v3i3.4160