Analisis Beban Kerja Fisik Dan Mental Bagian Produksi Dengan Menggunakan Metode Cardiovascular Load (CVL) Dan Bourdon Wiersma Di PT. Romi Violeta

Authors

  • Sarah Aliyah Sabhirah Universitas Pembangunan Nasional Veteran Jawa Timur
  • Rusindiyanto Rusindiyanto Universitas Pembangunan Nasional Veteran Jawa Timur

DOI:

https://doi.org/10.55606/jtmei.v2i2.1676

Keywords:

Workload, Cardiovascular Load, Bourdon Wiersma

Abstract

A manufacturing company engaged in the furniture industry, specializing in wood, rattan and glass products. Most of the production orders were related to table products, stands and chests, with a total of 15,224 orders for other products. Based on results of direct observation at PT. Romi Violeta from the production process department says that due to the limited working hours, especially as the production orders for tables, shelves, etc. increase every month, the physical and mental strain employees take to meet their production targets. I often complain about. For commodity products. The purpose of the research is to find cases of high physical and mental stress at manufacturing sites with high stress standards such as tables, shelves, and chests of drawers, and to provide suggestions for improving the reduction of physical and mental stress. . Based on an analysis of the results, the mean cardiovascular load (CVL) percentage was found to be 43.902%, indicating that the assessment needs improvement, and the Bourdon Vielsma test speed result was 12.593 seconds with a score of 7. , a body weight score (WS) of 11.5 is included in the adequate group (C). Accuracy is 3.26, score is 8, fair group (CB) weighted score (WS) is 12, constant is 8.185 seconds, score is 5.5, score is . 8 are in the suspicious (R) group.    

References

Chandra, Riny. 2017. “Pengaruh Beban Kerja dan Stres Kerja terhadap Kinerja Karyawan pada PT. Mega Auto Central Finance Cabang di Langsa”. Jurnal Manajemen Dan Keuangan, VOL.6, NO.1, MEI 2017. Aceh: Fakultas Ekonomi, Universitas Sam-udra.

Diniaty, dkk. 2016. “Analisis Beban Kerja Fisik dan Mental Karyawan Pada Lantai Produksi Dipt Pesona Laut Kuning”, Jurnal Sains, Teknologi dan Industri, Vol. 13, No. 2, Juni 2016, pp.203 – 210. Pekanbaru: Jurusan Teknik Industri, Fakultas Sains dan Teknologi, UIN Sultan Syarif Kasim Riau

Handika, dkk. 2020. “Analisis Beban Kerja Fisik dan Mental Operator Produksi di PD. Mi-tra Sari”. Jurnal Intent Vol 3. No. 2 Juli – Desember 2022. Banten : Program Studi Teknik Industri, Fakultas Teknik, Universitas Serang Raya.

Puteri Mahaji dan Sukarna Kamilah. 2017. “Analisis beban Kerja dengan Menggunakan Metode CVL dan NASA-TLX di PT. ABC”. Jurnal Spektrum Industri. ISSN : 2442 – 2630, Vol. 15, No. 2. Jakarta : Program Studi Teknik Industri, Fakultas Teknik, Universitas Muhammadiyah Jakarta.

Ramadhania, N dan Parwati, N. 2015. “Pengukuran Beban Kerja Psikologis Karyawan Call Center Menggunakan Metode NASA-TLX (Task Load Index) Pada PT. XYZ)”. Vol. 7, No. 015, Teknik Industri Fakultas Sains dan Teknologi Universitas Al Azhar In-donesia.

Tarwaka, 2015. Ergonomi Industri Dasar-Dasar Pengetahuan Ergonomi dan Aplikasi Di Tempat Kerja. Surakarta: Harapan Press

Downloads

Published

2023-05-25

How to Cite

Sarah Aliyah Sabhirah, & Rusindiyanto Rusindiyanto. (2023). Analisis Beban Kerja Fisik Dan Mental Bagian Produksi Dengan Menggunakan Metode Cardiovascular Load (CVL) Dan Bourdon Wiersma Di PT. Romi Violeta. Jurnal Teknik Mesin, Industri, Elektro Dan Informatika, 2(2), 150–167. https://doi.org/10.55606/jtmei.v2i2.1676