Pendampingan Faktor Faktor Penyebab Keterlambatan Pembangunan Jembatan Karang Semanding Kabupaten Jember

Authors

  • Dofir Surya Saputra Universitas Islam Negeri KH. Achmad Siddiq Jember
  • Ferdi Hidayat Universitas Islam Negeri Kiai Haji Achmad Siddiq Jember
  • Aminatus Zahriyah Universitas Islam Negeri Kiai Haji Achmad Siddiq Jember

DOI:

https://doi.org/10.55606/jpmi.v2i2.1695

Keywords:

assistance, factor, delay, construction, bridge

Abstract

The bridge at Karang Semanding was the reason for choosing the location due to a delay in the progress of the project construction which was scheduled to start on February 14 2023 and was targeted for completion on June 13 2023 but until March 14 2023 the implementation of the work had not started by the implementing party, namely CV. Bima Putra Nusantara. This service activity is carried out to analyze the factors causing delays in the Karang Semanding Bridge construction project. This mentoring activity aims to provide an accelerated approach in terms of pursuing delays in the construction of the Karang Semanding Bridge. Second, post-determination assistance, namely making questionnaires, processing data, analyzing the data that has been obtained from the questionnaires and then conclusions are drawn using the influence index test approach, frequency index, and interest index. The results of this assistance are carried out from identifying what factors cause delays. Factors causing delays in the construction of the Karang Semanding Bridge with the highest interest index value are technical factors with an interest index value of 48.1% and assistance providing an accelerated approach to delays in the construction of the Karang Semanding Bridge which is a reference for partner decision making, namely CV. Bima Putra Nusantara in the form of pre-orders for precast materials and the quantity and quality of workers that must be added.

References

Ghozali, I. (2014). Ekonometrika Teori, Konsep dan Aplikasi dengan IBM SPSS 22. Semarang: Badan Penerbit Undip.

Khoirul, K., Pristianto, H., & Rusmin, M. (2017). Analisis Penyebab Keterlambatan Pekerjaan Konstruksi Jembatan. Jurnal Teknik Sipil: Rancang Bangun, 2(2), 27–36.

MANGIWA, N. N. (2023). IDENTIFIKASI FAKTOR PENYEBAB KETERLAMBATAN PENANGANAN PEMBANGUNAN INFRASTRUKTUR JALAN DAN JEMBATAN PASCA BENCANA GEMPA BUMI DAN TSUNAMI DI KOTA PALU [PhD Thesis]. Universitas Tadulako.

Pangesti, R. D., Widoanindyawati, V., Suroso, S., Supriyo, S., Marsudi, M., Pamungkas, N. S., Setiawan, D. B., & Kusumastuti, D. R. (2022). PENDAMPINGAN PEMBANGUNAN KONSTRUKSI JEMBATAN BETON BERTULANG SEBAGAI AKSES KE MUSHOLLA AL BAROKAH NYATNYONO UNGARAN KABUPATEN SEMARANG. Bangun Rekaprima: Majalah Ilmiah Pengembangan Rekayasa, Sosial Dan Humaniora, 8(2, Oktober), 78–87.

Romdan, A. (2018). Evaluasi Faktor Penyebab Keterlambatan Kerja Pada Proyek Pekerjaan Pembangunan Penggantian Jembatan Sei. Ata IV di Kabupaten Tanah Bumbu Kalimantan Selatan. Buletin Profesi Insinyur, 1(2), 8–10.

Wahyuningtyas, A., & Waskito, J. P. H. (2021). ANALISA FAKTOR FAKTOR PENYEBAB KETERLAMBATAN PROYEK PEMBANGUNAN JEMBATAN JOYOBOYO. Axial: Jurnal Rekayasa Dan Manajemen Konstruksi, 9(2), 071–078.

Wiranata, A. A. (2018). Analisis Penerapan Manajemen Waktu pada PT Pembanguna Perumahan (Persero) Tbk. Laporan Penelitian. Teknik Sipil Universitas Negeri Udayana Bali. Tidak Diterapkannya Poin Tersebut Pada Kolom Keterangan.

Yunus, I., & Annisa, H. (2023). Pendampingan Perencanaan Jalan Ruas Kotu-Mebali Di Kabupaten Enrekang. Jurnal Pengabdian Masyarakat Universitas Lamappapoleonro, 1(2), 61–65.

Downloads

Published

2023-05-30

How to Cite

Surya Saputra, D., Ferdi Hidayat, & Aminatus Zahriyah. (2023). Pendampingan Faktor Faktor Penyebab Keterlambatan Pembangunan Jembatan Karang Semanding Kabupaten Jember. JURNAL PENGABDIAN MASYARAKAT INDONESIA, 2(2), 01–12. https://doi.org/10.55606/jpmi.v2i2.1695

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.