Evaluasi Quantity Take Off Beton Bertulang dengan BIM 5D pada Gedung Office COMTELINDO Balikpapan
DOI:
https://doi.org/10.55606/juprit.v5i3.6839Keywords:
5D Building Information Modeling (BIM), Quantity Take Off, Autodesk Revit, Reinforced Concrete, Cost Estimation (RAB), COMTELINDO Office BuildingAbstract
The application of five-dimensional Building Information Modeling (BIM 5D) enables building modeling to be integrated with quantity and cost calculations, thereby supporting greater accuracy in construction cost estimation. This study aims to evaluate the differences in the quantities and costs of reinforced concrete work between the consultant’s Bill of Quantities (BoQ) and the Quantity Take-Off results generated using Autodesk Revit based on BIM 5D, as well as to identify the work items with the largest deviations in the Office COMTELINDO Building Construction Project in Balikpapan. This study employed a quantitative method with a comparative approach. The structural model was developed based on the Detailed Engineering Design (DED) documents using Autodesk Revit 2024. Concrete and reinforcement quantities were then extracted using the Quantity Take-Off feature and integrated with unit prices to obtain the estimated construction costs. The results showed that the concrete volume obtained using BIM 5D was 301.860 m³, while the consultant’s BoQ recorded 307.320 m³, resulting in a difference of 5.460 m³ or a deviation of approximately −1.78%. The reinforcement quantity obtained using BIM 5D was 64,540.016 kg, compared with 63,821.215 kg based on the consultant’s BoQ, resulting in a difference of 718.801 kg or a deviation of approximately 1.13%. The largest volume deviation was found in the ring beam work, amounting to 67%. Meanwhile, the total cost based on BIM 5D was IDR 1,951,833,043.16, compared with IDR 1,950,220,075.14 based on the consultant’s BoQ, resulting in a difference of IDR 1,612,968.02 or 0.083%. The findings indicate that BIM 5D can be used as a measurable, transparent, and traceable evaluation instrument for verifying quantities and cost estimates of reinforced concrete structural work.
Downloads
References
Al Farabi, M., Husni, H. R., Siregar, A. M., & Bayzoni. (2023). Pemodelan dan perhitungan kembali Rencana Anggaran Biaya (RAB) Gedung UKM FISIP Tahap 2 Universitas Lampung berbasis teknologi Building Information Modelling (BIM). Jurnal Rekayasa Sipil dan Desain (JRSDD), 11(2), 275–286. https://doi.org/10.23960/jrsdd.v11i2.3139
Alathamneh, S., Collins, W., & Azhar, S. (2024). BIM-based quantity takeoff: Current state and future opportunities. Automation in Construction, 165, 105549. https://doi.org/10.1016/j.autcon.2024.105549
Fazis, M., & Tugiah. (2022). Perencanaan proyek dan penjadwalan proyek. Jurnal Sosial Teknologi, 2(12), 1365–1377. https://doi.org/10.59188/jurnalsostech.v2i12.517
Juliani, M. P., & Renaningsih. (2023). Analisa perbandingan volume beton metode konvensional pada hasil Bill of Quantity (BQ) dan BIM Autodesk Revit 2020 terhadap efektifitas biaya. Prosiding Seminar Nasional Teknik Sipil UMS, 631–637.
Kasoma, E., & Puspasari, V. H. (2023). Studi perbandingan analisa harga satuan pekerjaan tahun 2016 dan 2022 bidang Cipta Karya. Basement: Jurnal Teknik Sipil, 1(2), 141–148. https://doi.org/10.36873/basement.v1i2.10733
Nadia, N., & Nasution, M. I. P. (2024). Transformasi digital: Peran sistem informasi manajemen dalam meningkatkan efisiensi organisasi. Jurnal Ilmiah Ekonomi, Manajemen, Bisnis dan Akuntansi, 2(1), 627–634. https://doi.org/10.61722/jemba.v2i1.675
Purba, S. E., Diandra, N., & Feng, C.-W. (2022). Employing the BIM-based approach to analyze and improve the quality of detail construction cost estimation according to NRM 2 and SMPI. Jurnal Teknik Sipil, 22(2), 75–83. https://doi.org/10.26418/jtst.v22i2.56909
Putra, Y. D., Hendriyani, I., & Pratiwi, R. (2024). Analisis Building Information Modelling (BIM) 5D pada pekerjaan struktur Graha Sucofindo Balikpapan. Jurnal Konstruksi, 22(2), 108–115. https://doi.org/10.33364/konstruksi/v.22-2.2088
Rachman, T. A., Hendriyani, I., & Pratiwi, R. (2024). Analisis volume dan biaya pada proyek pembangunan rumah tinggal berbasis BIM 5D (Studi kasus proyek pembangunan rumah tinggal 3 lantai tipe 130 di Kota Balikpapan). Jurnal Talenta Sipil, 7(2), 860–869. https://doi.org/10.33087/talentasipil.v7i2.629
Santoso, I. S., Suroso, A., & Amin, M. (2023). Pengaruh tingkat penerapan BIM 5D terhadap kinerja biaya proyek konstruksi. Konstruksia, 14(2), 83–92. https://doi.org/10.24853/jk.14.2.83-92
Sapitri, M., & Safriani, M. (2023). Analisis perbedaan item pekerjaan dan volume dengan realisasi lapangan di pembangunan lanjutan Gedung Kejari Tapaktuan. Comserva: Jurnal Penelitian dan Pengabdian Masyarakat, 2(10), 2304–2319. https://doi.org/10.59141/comserva.v2i10.598
Saraireh, I. M. A. Q., & Haron, A. T. (2020). Understanding the conceptual of Building Information Modeling: A literature review. International Journal of Civil Engineering and Technology, 11(1), 165–171. https://doi.org/10.34218/IJCIET.11.1.2020.018
Sugiyono. (2022). Metode Penelitian Kuantitatif, Kualitatif, Dan R&D. Alfabeta.
Wacano, S., & Arditya Ihsan, S. (2024). Analisis perbandingan perhitungan quantity take off menggunakan BIM Revit dengan metode konvensional pada struktur atas proyek pembangunan Gedung RSPON [Tugas akhir, Politeknik Negeri Jakarta].
Yudha, F. P., & Mutaqi, A. S. (2025). Literature review: Pemanfaatan Building Information Modeling (BIM) dalam konstruksi sebagai alat komunikasi dan kolaborasi dalam Integrated Project Delivery (IPD). Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, 3(4), 11–30. https://doi.org/10.61132/konstruksi.v3i4.1018
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Dina Ami Puspita Sari, Reno Pratiwi, Andi Marini Indriani

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.