Integrasi AHSP-SNI 2847:2019 pada Beton Bertulang dengan BIM 5D untuk Estimasi Biaya Mako Brimob Kaltim
DOI:
https://doi.org/10.55606/juprit.v5i3.6788Keywords:
2019, AHSP, BIM 5D, Estimated costs, SNI 2847Abstract
Building Information Modelling (BIM) is increasingly applied to improve the accuracy of quantity take-off and cost estimation; however, differences may occur between manual calculations, BIM, and consultant estimates due to reinforcement detailing and compliance with SNI 2847:2019. This study aims to evaluate reinforced concrete work against SNI 2847:2019 and compare concrete volume, reinforcement quantity, and cost estimates obtained from manual calculations, 5D BIM using Autodesk Revit 2024, and the consultant’s RAB. The study employed a quantitative, non-experimental case-study approach using secondary data consisting of Detailed Engineering Design (DED), consultant’s RAB, 2024 AHSP, and SNI 2847:2019. Structural elements were remodelled in Autodesk Revit 2024 after adjusting reinforcement details, including lap length, anchorage hooks, and stirrup spacing, according to the applicable standard. BIM results were validated through manual calculations and compared with the consultant’s RAB. The results show that several reinforcement details were not fully compliant, particularly in pedestal, beam, and sloof elements. After adjustment, the BIM model satisfied the audited SNI parameters. Concrete volume from BIM and manual calculation was 420.50 m³, compared with 440.50 m³ in the consultant’s RAB, resulting in a 20.00 m³ or 5% difference. Reinforcement quantity was 74,993.00 kg compared with 67,833.50 kg, resulting in a difference of 7,159.50 kg or 11%. The BIM-based reinforcement cost was Rp1,494,517,384, compared with Rp1,297,208,667 in the consultant’s RAB, producing a difference of Rp197,308,717 or 15%. The findings demonstrate that integrating SNI-based reinforcement detailing, BIM 5D, and AHSP supports a consistent and traceable approach to quantity take-off and cost estimation.
Downloads
References
Al Amin, A., Apriliano, D. D., & Imron, I. (2025). Penerapan Building Information Modelling (BIM) untuk estimasi biaya pekerjaan struktur bangunan rumah tinggal 1 lantai di daerah Halim Jakarta Timur. Journal of Accounting Law Communication and Technology, 2(1), 9–16. https://doi.org/10.57235/jalakotek.v2i1.3351
Alami, N., Aziz, U. A., & Margiarti, D. (2021). Studi komparasi perbandingan rencana anggaran biaya antara metode analisa harga satuan pekerjaan (AHSP) dan Standar Nasional Indonesia (SNI). Surya Beton: Jurnal Ilmu Teknik Sipil, 5(1), 10–19. https://doi.org/10.37729/suryabeton.v5i1.1104
Anggaraini, N. L. (2022). Perbandingan volume pada pekerjaan struktural dengan Building Information Modeling (Studi kasus: Proyek pembangunan Gedung Laboratorium Terpadu Kampus Sidotopo) [Skripsi, Universitas Tidar]. Repository Universitas Tidar.
Antonius. (2021). Perilaku dasar dan desain beton bertulang berdasarkan SNI 2847:2019. Unissula Press.
Arditya, S., & Wacano, S. (2024). Analisis perbandingan perhitungan quantity take off menggunakan BIM Revit dengan metode konvensional pada struktur atas proyek pembangunan gedung RSPON. Prosiding Seminar Nasional Teknik Sipil, 6(1), 336–343.
Badan Standardisasi Nasional. (2019). SNI 2847:2019: Persyaratan beton struktural untuk bangunan gedung dan penjelasan (ACI 318M-14 dan ACI 318RM-14, MOD). Badan Standardisasi Nasional.
Hendra, H., Deni, D., Karsono, B., Olivia, S., & Azhar, A. (2022). Pengenalan peran platform digital BIM (Building Information Modelling) dalam program Autodesk Revit bagi masyarakat pelajar Kota Lhokseumawe. Jurnal Solusi Masyarakat Dikara, 2(3), 166–171.
Jonathan, R., & Anondho, B. (2021). Perbandingan perhitungan volume pekerjaan dak beton bertulang antara metode BIM dengan konvensional. JMTS: Jurnal Mitra Teknik Sipil, 4(1), 271–280. https://doi.org/10.24912/jmts.v0i0.10473
Kamaludin, K. (2024). Optimalisasi proses konstruksi gedung bertingkat dengan Building Information Modeling (BIM). RekaRacana: Jurnal Teknik Sipil, 10(1), 19–28. https://doi.org/10.26760/rekaracana.v10i1.19
Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2024). Analisis harga satuan pekerjaan (AHSP) tahun 2024. Kementerian Pekerjaan Umum dan Perumahan Rakyat.
Laorent, D., Nugraha, P., & Budiman, J. (2019). Analisa quantity take-off dengan menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1), 1–8. https://doi.org/10.9744/duts.6.1.1-8
Rahman, S. B. A. (2022). Pengembangan modul prosedur perhitungan kekuatan struktur beton bangunan gedung sederhana menurut SNI 2847:2019. Jurnal Pendidikan Teknik Bangunan, 2(1), 43–58. https://doi.org/10.17509/jptb.v2i1.45974
Sugiyono. (2022). Metode Penelitian Kuantitatif, Kualitatif, Dan R&D. Alfabeta.
Wiranti, F., Nisumanti, S., & Al Qubro, K. (2022). Analisis perhitungan quantity take-off menggunakan Building Information Modeling (BIM) pada proyek Jalan Tol Indralaya–Prabumulih. Jurnal Rekayasa, 12(2), 192–202.
Yudi, A., Ulum, M. S., & Nugroho, M. T. (2020). Perancangan detail engineering design gedung bertingkat berbasis Building Information Modeling (studi kasus: Asrama Institut Teknologi Sumatera). Media Komunikasi Teknik Sipil, 00(00), 1–11.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 V. S. Ferama, R. Pratiwi, M. Kencanawati

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.