Rencana Anggaran Biaya dengan Metode BOW pada Pembangunan Ruang Kelas Baru Universitas Sunan Giri Surabaya

Authors

  • Mochamad Djaelani Universitas Sunan Giri Surabaya
  • Ella Anastasya Sinambela Universitas Sunan Giri Surabaya

DOI:

https://doi.org/10.55606/juprit.v1i3.615

Keywords:

cost design, construction budget, BOW method.

Abstract

The need for space to carry out human activities is increasing day by day. One of them is for teaching and learning activities that require better classrooms. With the growth in the number of students, the need for classrooms cannot be avoided. Classroom construction is a form of labor-intensive construction work. To start construction activities, start by budgeting construction costs. Cost budgeting is required so that the contractor can provide information to the client regarding the required costs. This study aims to determine the budget for building classrooms. The study used the BOW method. The BOW method is considered sufficient because it makes the building labor intensive. The research was conducted on an area of ​​5 x 7 meters. The results showed that to build a classroom on vacant land, Rp. 74.567.534. Contractors strengthen foundation work such as concrete work, wall work, and floor work. These three jobs use higher construction costs.

References

Ashworth, A. (2004). Cost Studies of Buildings. Pearson Education Ltd. UK.

Agustapraja, H. R., & N. A. Affandy. (2017). Perbandingan Estimasi Anggaran Biaya Dengan Metode Sni Dan Bow Pada Proyek Pembangunan Gedung D Fakultas Agama Islam Universitas Islam Lamongan. Universitas Kadiri Riset Teknik Sipil, 1(2), 1-9.

Azhar, N., U. F. Rizwan., & S. M. Ahmed. (2008). Cost Overrun Factors in Construction Industry of Pakistan. Advancing and Integrating Construction Education, Reseach & Practice, 1(1), 499-508.

Caffieri, J.J., P.E Love.. A. Whyte., D. D. Ahiaga-Dagbui. (2018). Planning for Production in Construction: Controlling Costs in Major capital Projects. Production Planning Control ,29, 41–50.

Darmawan, D. & M. Djaelani. (2021). Correlation of Work Stress and Performance of Construction Project Manager, ARRUS Journal of Engineering and Technology, 1(2), 55-59.

Djaelani, M. & E. A. Sinambela. (2021). Analisis Rancangan Perencanaan Biaya dengan Metode Perhitungan Biaya Nyata Pada Pelaksanaan Proyek Perumahan Sederhana. Journal of Trends Economics and Accounting Research, 2(2), 32-36.

Djaelani, M., Jahroni, D. Darmawan, & E. A. Sinambela. (2022). Evaluation of the Need for Motorcycle and Car Parking Spaces, International Journal of Service Science, Management, Engineering, and Technology, 1(1), 16 – 19.

Kirkham, R. (2007). Ferry and Brandon's Cost Planning of Buildings. Blackwell Publishing Ltd. UK.

Sinambela, E. A., D. Darmawan & B. Gardi. (2022). Production Cost Calculation Analysis Using Variable Costing Method, International Journal of Service Science, Management, Engineering, and Technology, 1(2), 47–50.

Sinambela, E. A., D. Darmawan & B. Gardi. (2022). Cost Control through Break Even Point Analysis, International Journal of Service Science, Management, Engineering, and Technology, 1(3), 1 – 3.

Smith, J., N. O'Keeffe., J. Georgiou. & P. E. D. Love. (2004). Auditing Construction Costs During Building Design: A case study of cost planning in action. Managerial Auditing Journal, 19(2), 259-271.

Walker, A. (2015). Project Management in Construction, 6th Ed. Blackwell Science, Oxford.

Downloads

Published

2022-08-22

How to Cite

Mochamad Djaelani, & Ella Anastasya Sinambela. (2022). Rencana Anggaran Biaya dengan Metode BOW pada Pembangunan Ruang Kelas Baru Universitas Sunan Giri Surabaya. Jurnal Penelitian Rumpun Ilmu Teknik, 1(3), 60–67. https://doi.org/10.55606/juprit.v1i3.615