Analisis Manajemen Perawatan Mesin Produksi Kemasan Plastik Spout dengan Metode Reliability Centered Maintenance (RCM)
DOI:
https://doi.org/10.55606/juprit.v3i3.4236Keywords:
Plastic Production Machine, RCM, Maintenance Schedule, Maintenance CostAbstract
Plastic packaging manufacturing company, X Corporation uses assembly machines to produce spout. In 2023, the assembly machine experinced a high frequency of downtime, which is 106 times with a total 190.5 hours. This research aims to analyze the machine maintenance management with the RCM method. Determination of critical components by FMEA, with an RPN value at very high level (> 200), four critical components are obtained, namely line feeder, transmission, electrical sensor, pneumatic. Calculation of reliability values using Weibull distribution. Then obtained the reliability value of line feeder component 0.5 when (t) 128 hours, transmission 0.5 when (t) 96 hours, electrical sensor 0.5 when (t) 184 hours, and pneumatic 0.5 when (t) 627 hours. Based on the reliability value, the line feeder maintenance schedule is determined every 5 days (max. inspection), 2 weeks (repair), 1 month (replace); transmission every 4 days (max. inspection), 4 weeks (repair), 2 months (replace); electrical sensor every 8 days (max. inspection), 5 months (repair), 10 months (replace); pneumatic every 28 days (max. inspection), 3 months (repair), 6 months (replace); overhaul at least once a year. The preventive maintenance cost in one year is Rp45,107,309.
Downloads
References
A. Fauziyyah dan S. Sriyanto, “Analisis Perhitungan Biaya Perawatan Sebagai Dasar
Evaluasi Penggantian Mesin CTCM (Continuous Tandem Cold Mill) Pada Divisi Cold Rolling Mill PT. Krakatau Steel,” Industrial Engineering Online Journal, Vol. 4, No.1, April 2016, pp. 1-7.
Febianti, E., Ferdinant, P. F., Wahyuni, N., & Riyani, D. N. (2020). Usulan
Ignatio D. Pranowo, “Sistem dan Manajemen Pemeliharaan,” 2019, (Sleman: Deepublish
Metode Reliability Centered Maintenance (RCM) dan Maintenance Value Stream Map (MVSM)(Studi Kasus di PT. Nusa Indah Jaya Utama). Integrasi: Jurnal Ilmiah Teknik Industri, 7(2), 67-75.
Penjadwalan Perawatan Mesin Menggunakan Metode Reliability Block Diagram. Performa: Media Ilmiah Teknik Industri, 19(1).
Perubahan Berat Produk Corong pada Cetak Plastik Sistem Injeksi. J-Proteksion: Jurnal Kajian Ilmiah dan Teknologi Teknik Mesin, 7(2), 64-68.
Publisher).
Sulistyono, S., & Dani, A. (2023). Variasi Waktu dan Tekanan Injeksi terhadap
Syafei, M. I., & Suhendar, E. (2022). Analisis Perawatan Mesin dengan Pendekatan
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Jurnal Penelitian Rumpun Ilmu Teknik

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.